# Description Client Year
1 Assisted National Conservation Strategy Secretariat in formulation of policy guidelines for handling industrial pollution and analysis of cross Sectoral impacts. This study later formed a part of the National Conservation Strategy IUCN
1988
2 Assisted National Conservation Strategy Secretariat in developing suggested policy guidelines for orienting research and technology in the country towards environmental conservation. The study entailed review of more than 40 R&D institutions of the country and their over 550 programs. Detailed recommendations were developed for orienting these R&D programs towards conservation. This study later formed a part of the National Conservation Strategy IUCN
1988
3 Developed a conservation and environment protection strategy for the industrial sector for International Union for Conservation of Nature and Natural Resources (IUCN) and the NCS Secretariat, GOP.  This subsequently  formed a part of Pakistan’s National Conservation strategy IUCN
1988
4 Conducted a study to develop an integrated conservation programme which would include storm water management, wastewater recycling, community participation and awareness, sludge disposal, etc., for an area of concentrated environmental pollution in the Country RNE
1988
5 Assisted in implementing a five year “Environmental Technology Programme for Industry (ETPI)” of the Federation of Pakistan Chambers of Commerce & Industry (FPCCI). The programme entailed conducting of detailed environmental audits of the most polluting industrial sectors, development/identification of most suitable environmental solutions and then implementation of the same. RNE
1994
6 Conducted a detailed survey of Municipal Solid Waste on behalf of Karachi Metropolitan Corporation (KMC) in 1994. on the basis of the survey a scheme was proposed for establishing proper sorting stations and for setting-up compost plants in Karachi. At that time technology was not available which could generate energy in a cost effective manner because of which this option was not considered. ADB
1994
7 Assisted Pakistan Tanners Association (PTA) in implementing its “Environmental Management Programme” at all the tanner clusters in Pakistan - Karachi, Lahore, Multan, Sheikhupura, Gujranwala, Sialkot, etc.. This is a five year programme and has the following components:
  • Solid Waste Management;
  • Combined Effluent Treatment Plants;
  • upgradation of Sewerage and Drainage System;
  • Chromium Recovery Program;
  • Industrial Extension Program; and
Occupational Health Program.
PTA
1995 – 2000
8 At the behest of Korangi Association of Trade and Industry (KATI), NMC has prepared an exhaustive study “Uplift Programme of Korangi Industrial Area (UPKIA)”. The study aims at improvement of overall setup of KIA, its layout for industrial units by categories, layout of civic amenities like water, sewerage system, gas, electricity, telephone etc., and their management structure. It also includes future plan for development, need assessment for both environmental control and civic / service amenities management including Solid Waste Management, Occupational Health and Safety Programme (OHSP), Combined Effluent Treatment Plants (CEPTs), Re-treatment facilities in individual units, updation of infrastructure facilities, chemical recovery plants in individual units etc.  The study also includes the development of capital cost estimation and phasing of various components of the project KATI
1997
9 Conducted Environmental Screening of LNG-based 700 MW, Combined Cycle Power Station and LNG Export Facilities, and submitted the report to Environmental Resource Management, U.K. ERM